Work has begun on the replacement of Fort Pulaski’s Entrance Bridge over the South Channel of the Savannah River.
The southbound lane on the existing bridge will be closed for the duration of the bridge construction.…
The southbound lane on the existing bridge will be closed for the duration of the bridge construction.…